Lab Commercialization
The Transportation Laboratory offers a comprehensive range of testing services for various transportation engineering Materials with prices based on complexity and urgency. Additionally, our lab is equipped with specialised tools for conducting tests on hot mix asphalt, asphalt binder, aggregates, and soil. Report times depend on how quickly testing is needed.
Transportation Laboratory Testing Rates |
|||
Ser |
Category |
Test Description |
Commercial Testing Rates (Rs) |
1 |
Hot Mix Asphalt Tests |
Marshall Mix Design 6" Sample |
|
a. Asphalt Mix Design Report |
50,000 |
||
b. Sample Preparation |
1,500 |
||
c. Saw Cutting for Marshall Samples |
1,500 |
||
d. Gmm (6") |
3,500 |
||
e. Gmb (6") |
1,500 |
||
f. Stability & flow (6") |
4,000 |
||
g. Loss of Stability (6") |
3,500 |
||
h.Job Mix Formula (JMF) |
300,000 |
||
2 |
Marshall Mix Design 4" Sample |
||
a. Asphalt Mix Design |
40,000 |
||
b. Sample Preparation |
1000 |
||
c. Saw Cutting for Marshall Samples |
1500 |
||
d. Gmm (4") |
3000 |
||
e. Gmb (4") |
1500 |
||
f. Stability & flow (4") |
3500 |
||
g. Loss of Stability (4") |
3000 |
||
h. JMF |
250,000 |
||
3 |
Preparing of HMA Sample by Roller Compactor Machine |
20000 |
|
4 |
Wheel Tracking Test |
40,000 |
|
a. Rutting & Cracking in Dry Condition |
|||
b. Rutting & Cracking through blowing of Air Condition |
|||
5 |
Resilient Modulus Test (UTM) |
||
a. MR |
30000 |
||
b. IDT |
|||
c. TSR |
35000 |
||
6 |
Indirect Fatigue |
20,000 |
|
7 |
Asphalt Binder Tests |
Penetration Test |
3,000 |
8 |
Flash/Fire Point Test |
3000 |
|
9 |
Bituminous Centrifuge Extraction Test by Ignition Method |
8500 |
|
10 |
Filterless Centrifuge Extraction Test |
5000 |
|
11 |
Loss on Heating – Rolling Thin Film Oven (RTFO) |
15000 |
|
(Short-Term Ageing of Bitumen) |
|||
13 |
Rotational Viscometer |
15,000 |
|
(Viscocity of Bitumen) |
|||
14 |
Degassing Oven |
5000 |
|
(Degassing of Bitumen Sample) |
|||
15 |
Abson Test |
10,000 |
|
(Recovery of Bitumen by Abson Method) |
|||
16 |
Ductility Test |
3500 |
|
17 |
Specific Gravity test of bitumen |
3000 |
|
18 |
Solubility test of Bitumen |
5000 |
|
19 |
Softening Point test |
3000 |
|
20 |
Saybolt Viscosity |
6000 |
|
21 |
Aggregates |
Sieves (Coarse and Fine Aggregate) |
|
a. Aggregate Gradation |
2500 |
||
b. Gradation (Blending) |
3000 |
||
d. Aggregate absorption |
1,000 |
||
e. Aggregate Specific Gravity |
2,000 |
||
23 |
Flakiness & Elongation Test |
3500 |
|
( Shape Test of Aggregate) |
|||
25 |
Los Angles Abrasion Test |
||
a. Small size Aggregate |
2500 |
||
b. Large Size Aggregate |
3500 |
||
26 |
Aggregate Impact Value Test |
2000 |
|
(Impact Value of aggregate) |
|||
27 |
Crushing Value Test |
3000 |
|
(Crashing Value of Aggregate) |
|||
28 |
Soundness test of aggregate |
20,000 |
|
31 |
Soil Index Test |
2500 |
|
(Liquid Limit & Plastic Limit of Soil) |
|||
32 |
Sand Cone Test |
3500 |
|
(Field Desnity / Compaction Test) |
|||
35 |
Speedy Moisture Test with Calcium Carbide |
3000 |
|
(To find out Moisture in Soil) |
|||
36 |
Digital PH/MVC Meter |
20000 |
|
PH Value of Soil & Water |
|||
38 |
Sand Equivalent Test |
3000 |
|
39 |
Maximum Dry Density (Proctor Test) |
||
a. Standard Compaction (4" Mould) |
5000 |
||
b. Standard Compaction (6" Mould) |
|||
c. Modified Compaction (4" Mould) |
|||
d. Modified Compaction (6" Mould) |
|||
41 |
CBR Test |
||
a. 1 point Unsoaked |
7000 |
||
b. 3 point unsoaked |
9000 |
||
c. 1 point soaked |
10,000 |
||
d. 3 point soaked |
15,000 |
||
42 |
Field Tests |
Computer Controlled Profilograph |
25,000 Per KM |
(Measurement of Surface Profile with Profilograph & Quantifying (IRI) |
|||
46 |
Pavement Core Drilling Machine |
||
a. Collection of Core Samples |
5000 per sample |
||
49 |
Site Visit |
3000 per person per visit |
*These rates are for normal testing; multiply these rates by the following factors for witness and urgent tests.
Test Mode |
Normal |
Witness |
Urgent |
Factors |
1x |
1.5x |
2.5x |
Report Time |
5 working days |
5 working days |
2 working days |
Time Slot |
– |
It will be given according to the lab’s testing schedule, provided no academic activities are going on. |
It will be given according to the lab’s testing schedule, provided no academic activities are going on |
Note: Transportation facility or charges for the same will be provided by the client.
Note: Academic activities/ institutional duties will be given priority.
Contact us for more information and the availability of a time slot.
Email: [email protected]
Tel: +92-51-90854136